Wednesday, October 4, 2017

A DAY OF MISADVENTURE WITH TYPHOON ONDOY (INTERNATIONAL NAME KETSANA)

September 29, 2009
MABUHAY!
PROJECT MOBILIZATION
After hearing our boss briefing on this rainy Tuesday morning in our office in Karangalan Village, Pasig City, we were divided into two teams. We are to mobilize on our new project at One Serendra building in Taguig City to do architectural finishing works. Each team had their own vehicle that are both double cab pick up trucks carrying ample manpower and materials to construct our temporary field office. Arriving at the job site at 10 am, we were informed by the security guards that the construction management declares a work stoppage due to the continuous heavy rainfall brought about by typhoon Ondoy with an international name of Ketsana.

WALKING FROM TAGUIG CITY TO PASIG CITY
We tried to go back our office but when we were at C5 Highway, we were stuck in a bumper to bumper traffic jam which is obviously caused by heavy flooded roadway ahead. I received a phone call from my boss telling us to immediately go back to our office because the flood water is rising rapidly and help them save so many things. There is no other quicker way to get there but to walk around 10 kilometers on flood water. Me and 3 of my office mates decided to take the risk so we walk and just instructed our drivers to take good care of the materials and the vehicles. Around 30 minutes of trekking the flooded roadway and still raining heavily, we saw a roving fire truck. Then we asked the fireman for us to hitch a ride and they let us in. We saw village after village heavily flooded due to non stop rainfall that day. Reaching a bridge at Marikina River near Manggahan Pasig, the fire truck stop then the firemen help some drowning residents who were carried by flash flood. 
These photos were taken just outside our office building

THE RISE OF FLOOD WATER
Passing through Kaginhawaan Street which is near the entrance of Karangalan Village around 1pm, I saw an exodus of not just human residents but also snakes swimming above flood water which is now just below my waist line. This is just like crossing a jungle river.

Flooded vehicles in our office parking lot

SEARCH FOR FOOD

Arriving at our office at 2pm, I told my boss to send one of our office mate to look for a grocery store and buy some food because no one can enter the house kitchen which is now submerged with very high flood water. The refrigerator and cabinets in the kitchen are full of food. Our office mate fortunately entered in the nearest grocery store before the main entrance closes due to mad rush of many customers who are panic buying. 

SAVING OUR OFFICE EQUIPMENT AND DOCUMENTS
The rain still continuously falling, we transferred our office equipment and documents on a higher elevation for the fear that the flood water will reach the second floor which is 4 to 5 metes high from the ground line. After taking our humble dinner of rice and can foods, I volunteered to watch over that night to randomly check if the flood water will still rise. There was a candle light near my bed situated at the elevated portion of the entrance foyer just a few steps towards the second floor. This is around 7pm. My estimate of the flood water height is around 2 to 3 meters high. I can hear people outside who are trap inside their house shouting for help but at this time nobody can do anything. I cannot also call my children because my cell phone is already drain because the electricity was cut off in the morning. I just close my eyes and pray that the rain will stop and the flood water to subside. 
Flooded vehicles in our office parking lot
GOING HOME TO MY FAMILY
7 am the following day, thank God the rain stop. After gaining enough strength from just a few hours of sleep, I bid farewell to my boss to go home to Pampanga to check on my children. I bravely cross the village roadway with a flood water height just above my shoulder ( 1.2 mtrs -1.5 mtrs.) headed towards the Imelda Avenue then at Marcos Highway. When I reached the Santolan MRT station at Marcos Highway, I changed my wet clothes before boarding the train then alighting at  Cubao Station where I took a bus going to my hometown Pampanga.

During my walk at the still flooded thoroughfare, I saw grim images of nature's wrath that will definitely be in my memory for as long as I live. The pictures below are not mine but the horrific images they show are very similar with what I actually witnessed.







Thursday, December 15, 2016

WORK INTER-PHASE : WHY PROPER COORDINATION IS VERY CRITICAL IN CONSTRUCTION

December 12, 2016
MABUHAY!

Work inter-phase in construction is very important. It is the harmonious coordination of various trades-structural, architectural, electrical, plumbing, fire protection, mechanical and the like to complete a certain scope of work. In a complex real-life construction composed of hundreds or thousands of different activities, one must identify (usually the Project Manager) which activity is the predecessor or successor. The successor cannot start unless the predecessor is not complete. If that is the case, the delay in the construction is inevitable.

Let us study a simple example- the installation of an overhead and base modular cabinet in one of my condominium project. When you say modular, it is already cut to size and ready to install. Let us count how many work inter-phase we have from delivery to final installation.

1. DELIVERY OF MODULAR CABINETS
Delivered pre-fabricated HDF cabinets
Delivered pre-fabricated HDF cabinets

Parts of the HDF cabinet still in packaging
Parts of the HDF cabinet still in packaging

2. ASSEMBLY OF MODULAR CABINETS
Assembly of Drawers
Assembly of Drawers

CLICK the LINK to READ the related article: Construction of a Happy Kitchen

Assembly of the base cabinets
Assembly of the base cabinet

Assembly of the overhead cabinet and installation of hardware
Assembly of the overhead cabinet and installation of hardware
3. INSTALLATION OF PLUMBING ROUGHING-INS
PVC pipe stub-out for the grease trap
PVC pipe stub-out for the grease trap already in place before the installation of base cabinet

Hot and cold tapping are already embedded. They are capped for protection from clogging.
Hot and cold tapping point are already embedded. They are capped for protection from clogging. 

4. INSTALLATION OF ELECTRICAL ROUGHING-INS
These wires will supply the electricity for the electric stove
These wires will supply the electricity for the electric stove

5. INSTALLATION OF OVERHEAD CABINET
Checking the level of the bottom part of the overhead cabinet
Checking the level of the bottom part of the overhead cabinet
CLICK the LINK to READ the related article: Design and Build Construction

Then counter check of the level at the top portion
Then counter check of the level at the top portion

6. INSTALLATION HARDWARE AND HANDLES
INSTALLATION HARDWARE AND HANDLES


7. INSTALLATION OF OPEN SHELVES
INSTALLATION OF OPEN SHELVES


8. INSTALLATION OF RANGE HOOD
INSTALLATION OF RANGE HOOD


10. INSTALLATION OF FILLER
Wood filler to seal the gap between the concrete wall and overhead cabinet
Wood filler to seal the gap between the concrete wall and overhead cabinet

11. INSTALLATION OF BASE CABINET
INSTALLATION OF BASE CABINET


12. CORING FOR GREASE TRAP DRAIN PIPE
hole saw for a perfect fit of the pipe
Use a hole saw for a perfect fit of the pipe. Seal the gap between the pipe and the base cabinet with polyurethane sealant to prevent the entry of insects.

13 ASSEMBLY OF GREASE TRAP
ASSEMBLY OF GREASE TRAP


14. INSTALLATION OF GREASE TRAP
Plumbers installing the grease trap
Plumbers installing the grease trap

CLICK the LINK to READ the related article: Construction Education: Installation of Anti Termite Reticulation Pipes

The installed grease trap
The installed grease trap

15. INSTALLATION OF HARDWARE AND HANDLES
Installation of doors and handles for the base cabinet
Installation of doors and handles for the base cabinet

Installation of doors and handles for the base cabinet
Installation of doors and handles for the base cabinet

16. INSTALLATION OF FILLER
The filler will seal the gap between the door jamb and the base cabinet
The filler will seal the gap between the door jamb and the base cabinet

17. INSTALLATION OF 3/4" THK MARINE PLYWOOD BACKING
 installing the plywood backing to receive the granite countertop
Before installing the plywood backing to receive the granite countertop, block out the portion where the kitchen sink and the electric stove will be placed.

18. INSTALLATION OF GRANITE COUNTERTOP
Block out also the portion of the kitchen sink and the stove in the granite countertop
Block out also the portion of the kitchen sink and the stove in the granite countertop

Before fixing the granite countertop, make sure the backing must overlap
Before fixing the granite countertop, make sure the backing must overlap 

Check the corners make sure the granite countertop and the backing are in perfect fit
Check the corners make sure the granite countertop and the backing are in a perfect fit


19. INSTALLATION OF KITCHEN SINK AND FAUCET
INSTALLATION OF KITCHEN SINK AND FAUCET
Seal off with silicone sealant the ream of the kitchen sink in contact with granite countertop to prevent the seepage of water

20. CONNECTING THE SINK TO THE GREASE TRAP
CONNECTING THE SINK TO THE GREASE TRAP


21. INSTALLATION OF ELECTRIC COOKTOP
INSTALLATION OF ELECTRIC COOKTOP
Make sure the cooktop is squarely fitted on the edges of the granite countertop

CLICK the LINK to READ the related article: Enhancing Construction Education by Attending Philconstruct 2016

The installed electric cooktop
The installed electric cooktop

22. CONNECTING THE COOKTOP TO THE ELECTRICAL SUPPLY
All electrical works must be done by a licensed electrician
All electrical works must be done by a licensed electrician

23. INSTALLATION OF GRANITE SPLASHBOARD
INSTALLATION OF GRANITE SPLASHBOARD
All gaps between the granite countertop and the splashboard must be sealed by a polyurethane sealant

24. INSTALLATION OF ELECTRICAL DEVICES
Make sure the switch plate must be squarely fitted with the granite splashboard
Make sure the switch plate must be squarely fitted with the granite splashboard

25. FINAL INSPECTION, CLEANING, AND TESTING
The completed base cabinet
The completed base cabinet

The completed overhead cabinet
The completed overhead cabinet
26. FINISH PRODUCT
The completed installed kitchen cabinet with plumbing fixtures
The completed installed kitchen cabinet with plumbing fixtures

One would think that for a simple installation of the cabinet would require you 26 work inter-phase and that seems to be exasperating. That is why careful planning is really needed to attain the satisfactory result. Personally, I always adhere to this wise saying, as a matter of fact, I made it my life principle that:
PLANNING without EXECUTION is DAYDREAM but EXECUTION without PLANNING is NIGHTMARE.

CLICK the LINK to READ the related article: Construction of Duplex Resort Villa At Clark Freeport Zone





Wednesday, October 19, 2011

HEAVY EQUIPMENT IN CONSTRUCTION - MAKING OUR WORK ACCURATELY FAST

October 19, 2011
MABUHAY!

Heavy equipment machines are very, and I would like to put the emphasis, VERY IMPORTANT in our modern construction works. With projects nowadays getting more bigger and more complex in scope, what is hard for manual labor to accomplish a large construction project during ancient time say the pyramid of Giza, Great Wall of China or Angkor Wat in Cambodia, in terms of speed, stability, and economy, is now achievable through modern mechanized equipment. Our task of lifting very heavy loads, transporting materials and manpower to very remote projects sites, construction of skyscrapers reaching the sky, tunnels under large bodies of waters, bridge crossing continents and the like are now possible. And maybe someday, we will be the eyewitness of humans building something in outer space.

backhoe
The backhoe will lift and transport the container van to the mobile crane