Showing posts with label typhoon Ondoy. Show all posts
Showing posts with label typhoon Ondoy. Show all posts

Wednesday, October 4, 2017

A DAY OF MISADVENTURE WITH TYPHOON ONDOY (INTERNATIONAL NAME KETSANA)

September 29, 2009
MABUHAY!
PROJECT MOBILIZATION
After hearing our boss briefing on this rainy Tuesday morning in our office in Karangalan Village, Pasig City, we were divided into two teams. We are to mobilize on our new project at One Serendra building in Taguig City to do architectural finishing works. Each team had their own vehicle that are both double cab pick up trucks carrying ample manpower and materials to construct our temporary field office. Arriving at the job site at 10 am, we were informed by the security guards that the construction management declares a work stoppage due to the continuous heavy rainfall brought about by typhoon Ondoy with an international name of Ketsana.

WALKING FROM TAGUIG CITY TO PASIG CITY
We tried to go back our office but when we were at C5 Highway, we were stuck in a bumper to bumper traffic jam which is obviously caused by heavy flooded roadway ahead. I received a phone call from my boss telling us to immediately go back to our office because the flood water is rising rapidly and help them save so many things. There is no other quicker way to get there but to walk around 10 kilometers on flood water. Me and 3 of my office mates decided to take the risk so we walk and just instructed our drivers to take good care of the materials and the vehicles. Around 30 minutes of trekking the flooded roadway and still raining heavily, we saw a roving fire truck. Then we asked the fireman for us to hitch a ride and they let us in. We saw village after village heavily flooded due to non stop rainfall that day. Reaching a bridge at Marikina River near Manggahan Pasig, the fire truck stop then the firemen help some drowning residents who were carried by flash flood. 
These photos were taken just outside our office building

THE RISE OF FLOOD WATER
Passing through Kaginhawaan Street which is near the entrance of Karangalan Village around 1pm, I saw an exodus of not just human residents but also snakes swimming above flood water which is now just below my waist line. This is just like crossing a jungle river.

Flooded vehicles in our office parking lot

SEARCH FOR FOOD

Arriving at our office at 2pm, I told my boss to send one of our office mate to look for a grocery store and buy some food because no one can enter the house kitchen which is now submerged with very high flood water. The refrigerator and cabinets in the kitchen are full of food. Our office mate fortunately entered in the nearest grocery store before the main entrance closes due to mad rush of many customers who are panic buying. 

SAVING OUR OFFICE EQUIPMENT AND DOCUMENTS
The rain still continuously falling, we transferred our office equipment and documents on a higher elevation for the fear that the flood water will reach the second floor which is 4 to 5 metes high from the ground line. After taking our humble dinner of rice and can foods, I volunteered to watch over that night to randomly check if the flood water will still rise. There was a candle light near my bed situated at the elevated portion of the entrance foyer just a few steps towards the second floor. This is around 7pm. My estimate of the flood water height is around 2 to 3 meters high. I can hear people outside who are trap inside their house shouting for help but at this time nobody can do anything. I cannot also call my children because my cell phone is already drain because the electricity was cut off in the morning. I just close my eyes and pray that the rain will stop and the flood water to subside. 
Flooded vehicles in our office parking lot
GOING HOME TO MY FAMILY
7 am the following day, thank God the rain stop. After gaining enough strength from just a few hours of sleep, I bid farewell to my boss to go home to Pampanga to check on my children. I bravely cross the village roadway with a flood water height just above my shoulder ( 1.2 mtrs -1.5 mtrs.) headed towards the Imelda Avenue then at Marcos Highway. When I reached the Santolan MRT station at Marcos Highway, I changed my wet clothes before boarding the train then alighting at  Cubao Station where I took a bus going to my hometown Pampanga.

During my walk at the still flooded thoroughfare, I saw grim images of nature's wrath that will definitely be in my memory for as long as I live. The pictures below are not mine but the horrific images they show are very similar with what I actually witnessed.







Sunday, February 12, 2017

SCHOOL REHABILITATION PROJECT FOR GMA KAPUSO FOUNDATION

May 31, 2010
MABUHAY!

THE PROJECT
The aftermath of typhoon Ondoy on September 2009 left widespread devastation in the Philippines especially Metro Manila. Many non-government organizations both local and abroad joined hands to rehabilitate the damages incurred. One of them is the GMA Kapuso Foundation headed by Mel Tiangco, a news anchorwoman of GMA TV network. They targeted the rehabilitation of ravaged school buildings. The beneficiary is the Banaba Elementary School in San Mateo, Rizal. The design was a 2-story building included in the first batch for construction.
Mel Tiangco of GMA Kapuso Foundation

THE AFTERMATH OF TYPHOON ONDOY ON BANABA ELEMENTARY SCHOOL

Typhoon Ondoy left a widespread devastation not only in this school but throughout Metro Manila that compelled us to reconsider revising our existing policies and procedures in disaster management.

THE PROPOSED SCHOOL BUILDING SITE


CLICK the LINK to READ the related article: Construction Workers - Unsung Heroes!

This stage will be demolished because it is situated inside the proposed building site.
THE EXISTING SCHOOL BUILDING SITE
Due to limited and narrow access, the delivery vehicles cannot enter the job site hence the construction materials are laid on the street then labors do the manual hauling resulting in a delay of our schedule.



THE DENSE NEIGHBORHOOD AT THE BACK OF THE SCHOOL

CLICK the LINK to READ the related article: Work Inter-Phase: Why Proper Coordination is Very Critical in Construction

THE PROJECT TEAM
 My boss assigned me to attend a meeting with members of the Philippine Contractor's Association (PCA) wherein our company is also a member of. I met also with Papa Gee Florez, the project's technical consultant, Sir Ed, and Mam Maricel, representatives from GMA Kapuso Foundation. 


The project team chilling out along the banks of  Marikina River 


The project team discussing the future construction

THE FIRST CONCRETE POURING
After lots of brainstorming, design analysis, and price negotiations, the construction commenced after the contract was awarded to us.

The first lift of the column already with formworks ready for concrete.

The nylon strings served as the X-Y dimension gridline reference.


CLICK the LINK to READ the related article: Lyceum of the Philippines University (LPU) Phase 2 Construction


Ongoing concreting works using 1- bagger mixer

Engr. Boyong, our project in charge, do an ocular inspection prior to concreting.


Worker's performing the Filipino construction ritual of "PADUGO" during first concrete pouring especially in the foundation. It is the dropping of animal blood in every foundation excavation to ward off evil spirits in the belief of having a safe construction till completion.

Footing tie beam already with gravel bedding


The ongoing concreting works
CLICK the LINK to READ the related article: Construction of Community Center Building - Habitat for Humanity

The ongoing masonry works

The stair ready for concreting

Most of the time, in an effort to finish the construction on time, workers must work even on rainy weather.
THE COMPLETION
I was not able to attend the blessing ceremony of this building but nevertheless, I am very much privileged to be part of this very nice project for a cause.
The completed school building.
CLICK the LINK to READ the related article: Construction of Villa Celine Resort