Showing posts with label Builder's Journal. Show all posts
Showing posts with label Builder's Journal. Show all posts

Tuesday, May 8, 2018

CONCRETE CONSTRUCTION PRODUCTIVITY BOOTCAMP 2018

January 8, 2018
MABUHAY!

This is a photo and video journal of my attendance to this training at Philconstruct 2018. As an advocate of continuous professional education in the construction industry, I personally find this training an eye opener on the magnitude of what else we can contribute to enhance the quality of CONCRETE.

Sunday, August 27, 2017

TRAVELLING AS IT IS! ROAD TRIP FROM ATENEO DE MANILA UNIVERSITY TO CUBAO, QUEZON CITY

August 12, 2017
MABUHAY!

TRAVELLING AS IT IS- is an unedited video footage of my travelling experience. My concept of travelling is riding public transportation, road trip from home to a job destination or just a stroll around the neighborhood. You can hear, feel and see the “REAL” sights & sounds of a place or destination that are usually not tourist trail. There are lot of street food to taste, adventures to seek, lots of local people to meet as well as fellow travelers wanting to share their own personal experiences. ENJOYING LIFE - AS IT IS!






Start: ATENEO DE MANILA UNIVERSITY (ADMU)
Destination: REGALIA PARK TOWER, CUBAO, QUEZON CITY, METRO MANILA
Mode of Transportation: Van


In this road trip, I was with my co-workers from an ocular inspection of our construction project in Ateneo de Manila University (ADMU). We navigated the busy streets of Quezon City- a highly urbanized and largest city of Metro Manila. We also passed by and took our lunch to our favorite noodle house that serves PANSIT BATIL PATONG, which is a pride delicacy of CAYAGAN province north of Luzon, Philippines. Pansit Batil Patong is composed of large round noodles with chopped carabao (water buffalo) meat & internal organs, carabao chicharon (water buffalo fried skin) mixed with white onion, red chili pepper and sugar cane vinegar.


Sunday, August 13, 2017

TRAVELING AS IT IS: ROAD TRIP FROM CUBAO, QUEZON CITY TO MAKATI CITY

August 9, 2017
MABUHAY!


Traveling AS IT IS! - is unedited video footage of my traveling experience. My concept of traveling is riding public transportation, a road trip from home to a job destination or just a stroll around the neighborhood. You can hear, feel and see the “REAL” sights & sounds of a place or destination that are usually not tourist trail. There is a lot of street food to taste, adventures to seek, lots of local people to meet as well as fellow travelers wanting to share their own personal experiences. ENJOYING LIFE - AS IT IS!


Start: CUBAO, QUEZON CITY
Destination: MAKATI CITY
Mode of Transportation: Car

In this road trip, I am going to an ocular inspection of our construction project in Makati City. I started early in the morning and navigated the busy streets of EDSA Hi-way passing thru several cities of Metro Manila. The construction of our project in Makati City is in full swing composing of two (2) towers. Then also, I included in the video our dinner with one of my favorite Filipino street food, the PARES – meaning pair. It’s a thick soup of beef meat and other internal organs then paired with rice. 




Sunday, August 6, 2017

ROUGH ELEPHANT RIDE IN CHANG PUAK CAMP, DAMNOEN SADUAK, THAILAND

September 17, 2016
MABUHAY!


TRAVELLING AS IT IS! - is an unedited video footage of my travelling experience. My concept of travelling is riding public transportation, road trip from home to a job destination or just a stroll around the neighborhood. You can hear, feel and see the “REAL” sights & sounds of a place or destination that are usually not tourist trail. There are lot of street food to taste, adventures to seek, lots of local people to meet as well as fellow travelers wanting to share their own personal experiences. ENJOYING LIFE - AS IT IS!

Start: CHANG PUAK CAMP
Destination: ELEPHANT SANCTUARY

Mode of Transportation: ELEPHANT

During our company sponsored outing in Thailand, we trekked upon the narrow foot path -riding at the back of an elephant.



The rough elephant ride at Chang Puak camp in Damnoen Saduak, Thailand brings back my childhood memory. I remember the days when my friends took me for a ride at the back of a carabao (water buffalo) to fetch their herd back home. I remember our bumpy ride through the muddy rice fields of our hometown Pampanga. This ride is similar but the elephant’s back is higher. The trail is not as rough as the rice fields maybe because the tour operator doesn’t want any untoward accident to happen. But since it’s my first time to ride an elephant, it’s a travel adventure really worth filming.


Tuesday, January 17, 2017

DESIGN AND BUILD CONSTRUCTION

July 2000- December 2001
MABUHAY!

Design and build construction is the trend in the industry nowadays. The biggest advantage of it is that the owner does not need to hire a design consultant which is commonly outsourced. Also during the course of construction, the coordination is much easier between the owner and the builder, who at the same time is the designer. This is particularly advantageous with medium rise buildings and special projects such as swimming pools, sewage treatment plant and industrial building.

As a young practicing architect, I get a chance to experience building my own design.

The proposed 3-story Apartment with Attic

Part of the facade of the completed project. The concept of this residential building is the combination of different shapes but predominantly govern by circular form. 

The adobe stone I use as decorative cladding in the balcony railing, window sill and window header came from the foundation of the old house formerly built here.

CLICK the LINK to READ the related article: Heavy Equipment in Construction - Making our Work Accurately Fast

3 Storey Mixed-Used Commercial Apartment


The completed building. I really like circular waving motif in a building facade.

The perspective sketch of 6 Story Residential Apartment Building

The completed project (sorry for the blurred photo)

CLICK the LINK to READ the related article: Construction of Villa Celine Resort

Sketch of the Chapel perspective.

The chapel building under construction

5 Storey Residential Building
CLICK the LINK to READ the related article: Construction of A Happy Kitchen - A Weekend Project


Saturday, January 7, 2017

QUALITY ISSUE: PAINT PEEL-OFF

January 6, 2017
MABUHAY!

The most common quality issue or punch list in construction during architectural finishing works is PAINT PEEL-OFF in a concrete masonry wall. This quality issue manifest in many forms:

INTERIOR PEEL-OFF
Interior paint peeling off

Interior paint peeling off

Interior paint peeling off

Interior paint peeling off

Skim coat flaking off

Skim coat flaking off

Skim coat flaking off

Skim coat flaking off

Skim coat flaking off

CLICK the LINK to READ the related article: Quality Issue: Concrete Hairline Cracks

EXTERIOR PEEL-OFF






PAINT BUBBLES


CLICK the LINK to READ the related article: Concrete Demolition: A Systematic Way of Knocking Down Concrete

PAINT CRACKS








CLICK the LINK to READ the related article: Work Inter-Phase: Why Proper Coordination is Very Critical in Construction

PAINT BLISTER DUE WATER SEEPAGE




PAINT DISCOLORATION



ROOT CAUSE
Incorrect surface preparation
  • Application of masonry putty first to the concrete substrate without primer paint.
  • Application of powder-based skim coat or gypsum board putty to correct the wavy surfaces of concrete. Most acrylic based paints and all solvent based paints are not compatible with powder base skim coat. Make sure to use acrylic-based skim coat recommended by the paint manufacturer

Insufficient curing time of concrete surface
  • The ideal curing period for concrete is 14 -28 days. Since the Philippines is a tropical country, concrete cure fast due to the intense heat of the sun. I also recommend doing the moisture test for concrete at 14 days. Cut a 1ft x 1ft polyethylene sheet and tape it with duct tape or masking tape on the concrete surface. Observe if there still a manifestation of water droplets, then the concrete is not yet fully cured.
  • The concrete surface if not yet cured has high alkalinity expressed in pH reading. Alkaline reacts on paint film causing discoloration and overall deterioration. A fresh concrete surface has 13 to 14 pH reading while 14 days concrete has 7 to 8 pH reading which is very ideal for painting works.

Water seepage

  • Water seepage is caused by temperature cracks on concrete surfaces which enable the rainwater or moisture from the exterior side to penetrate on paint coated surfaces causing it to bulge or blister.

Wrong Paint

  • Painting the wrong kind of paint will eventually result in paint peel off. Paint for metal or wood is not compatible with concrete surfaces.

PAINT PEEL-OFF ADHESION TEST
This destructive test is being conducted to check whether the paint or the base coat adhere to the concrete surface. If the paint coat detached in the base coat, repainting is only recommended. If the base coat detached on the concrete surface, stripping of paint up to bare concrete is recommended.


PAINTING RECTIFICATION METHOD

Surface Preparation 
  • Spot scrapping down to bare concrete to remove all paint cracks, paint bubbles. loose and damage paint.
  •  For concrete surfaces with cracks, widen the crack by making a 2 to 3mm V-groove. Patch the groove with a mixture of cement and concrete epoxy. For cracks with water leaks, patch the groove with a mixture of cement and water plug.
  • For surfaces with a powder, base skim coat, strip to bare the affected area using a grinder.
Primer
  • Apply 1 (one) full coat of primer paint as a base coat.
Putty/Skimcoat
  • For correction of uneven and wavy surfaces, spot apply the paint manufacturer's recommended masonry putty or acrylic-based skim coat.
Undercoat
  • Apply 1 (one) full coat of primer paint as an undercoat.
Top Coat
  • Apply 2 coats of specified paint as a final coat.
CLICK the LINK to READ the related article: Construction of Villa Celine Resort






Sunday, December 25, 2016

CONSTRUCTION OF A HAPPY KITCHEN - A WEEKEND PROJECT

December 25, 2015
MABUHAY!

Today, we are celebrating Christmas day in the Philippines. I remember last year doing a very nice project. When we move into this house in 2013, I had a small empty space of 2.5meters X 6meters on the right side. Since the exit door is located there, I convinced my wife that this space will be a nice dirty kitchen to do her cooking and laundry as well. And so when I had saved enough money, I started the construction of the flooring and the concrete countertop and lavatory.

the existing dirty kitchen
Our existing  DIRTY KITCHEN 
The concrete sink
The concrete sink 

The concrete kitchen countertop
The concrete kitchen countertop
CLICK the LINK to READ the related article: From Scrap to Craft! Furniture made from Wooden Palette 

THE TILE WORKS
For 2 years, I was not able to work on this project. And when I saved enough money, I bought and install  600mm X 600mm Homogenous tiles for the countertop and splashboard.
The completed tile work with tile grout and PVC tile trim

The new look of the kitchen countertop
The new look of the kitchen countertop
CLICK the LINK to READ the related article: Tile Installation: Notched Trowel Comb Technique

THE CARPENTRY WORKS
I didn't revise the existing wood division anymore for the base cabinet wherein I put 6-panel doors and 6 drawers using 19mm thick X 4ft X 8 ft plyboard. For the hanging cabinets, I put 6-panel doors with 1 open shelf at the side and small open shelf at the bottom. I also used the same specification of plyboard. For the hardware, I used the concealed hinges and 20mm diameter stainless steel circular handle- satin finish.

Assembly of overhead cabinet
Assembly of overhead cabinet

Installation of doors & hardware
Installation of doors & hardware
CLICK the LINK to READ the related article: Work Inter Phase: Why Proper Coordination is Very Critical in Construction

THE PAINTING WORKS
For the paint, I used the flat wall enamel for the base coat, Quick Dry Enamel for the top coat. For the colors, I played the alternating effect of 3 primary colors, the royal blue, the lemon yellow, and the international red.


The newly painted overhead cabinet
The newly painted overhead cabinet with circular handles

The  newly painted base cabinet with drawers and handles
The  newly painted base cabinet with drawers and handles

CLICK the LINK to READ the related article: Quality Issue: Paint Peel-Off

FINISHED PRODUCT
The completed overhead cabinet
The completed overhead cabinet

The completed base cabinet
The completed base cabinet

FROM DIRTY KITCHEN TO HAPPY KITCHEN
The new look of our dirty kitchen
The new look of our dirty kitchen

LET THE JOY OF THE SEASON BE WITH YOU AND YOUR FAMILY AS WELL, FROM YOUR BUILDER WISHING YOU -MERRY MERRY CHRISTMAS! PEACE ON EARTH!


CLICK the LINK to READ the related article: Visit to Philconstruct 2018